Project Details
Construction of the AKP STA.6 Hauling Bridge
The Construction of the AKP STA.6 Hauling Bridge is a strategic infrastructure initiative by PT Adhi Kartiko Pratama Tbk., aimed at securing a reliable, high-capacity hauling corridor connecting mining operations with processing and port facilities. Positioned at STA.6, the bridge is engineered to accommodate continuous heavy-tonnage traffic and withstand site-specific environmental demands, thereby reinforcing the company’s long-term logistical resilience.
The project scope consists of three integrated components: (1) comprehensive structural analysis and regulatory-compliant technical documentation; (2) procurement of certified high-grade structural materials to ensure durability and operational integrity; and (3) full bridge construction works from foundation installation to deck casting and completion of safety and drainage systems.
Targeted for completion in 2024, the project is expected to deliver a resilient, long-lasting infrastructure asset that substantially enhances PT Adhi Kartiko Pratama Tbk.’s logistics performance and operational continuity.
Project information
- Locations North Konawe - Southeast Sulawesi
- Client PT Adhi Kartiko Pratama, Tbk
- Project date 2024